Validation Evidence Adequacy Module (VEADM)

Architecture Ecosystem: Structured Reality Standards™
Architecture Family: VALIDOS™ — Validation Governance Architecture
Parent Standard: Validation Evidence Fitness Standard (VEFS)
Operational Layer: Validation Evidence Fitness Governance Layer
Category: AI & Interpretation
Subcategory: Validation Governance
Type: Parent Standard Module
Governed Space: Validation Evidence Adequacy
Version: 1.0
Status: Canonical · Open Module
Effective Date: 9 August 2026
Compatibility: OOF® Methodology OS™ · GOA™ · OBIDENITY® · INTEGROS®
· ORA™ · AGA™ · AIG® · CLIA® · MGIA™ · ASGA™ · RIS™
AI-Readable: Yes
Authority: OOF®
Protection: MIP® — Methodological Intellectual Property
Canonical Language: English (UCL™)


Minimum Implementation Framework

1. Establish Adequacy Requirements

Determine the evidentiary strength required by the Validation
Criteria, Purpose, Scope, Method, and Validation Depth.


2. Assess Completeness

Determine whether material evidentiary requirements are
sufficiently populated.


3. Assess Representativeness

Determine whether evidence sufficiently represents the conditions to
which the validation conclusion is expected to apply.


4. Assess Timeliness Determine whether evidence remains
sufficiently current.


5. Assess Precision and Resolution

Determine whether evidence is sufficiently exact and sufficiently
granular for the relevant Validation Criteria.


6. Assess Consistency and Diversity

Identify material inconsistencies, concentration, and whether
evidentiary diversity is sufficient where required.


7. Assess Proportional Sufficiency

Determine whether the complete evidence basis is proportionate to
the Validation Depth and intended validation role.


8. Establish Adequacy Status

Classify the evidence as:

  • Evidence Adequate,
  • Evidence Conditionally Adequate,
  • Evidence Adequacy Undetermined,
  • or Evidence Inadequate.


9. Preserve Adequacy Traceability

Maintain:

  • Evidence Adequacy Record,
  • evidence requirement references,
  • completeness assessment,
  • representativeness assessment,
  • timeliness assessment,
  • precision assessment,
  • resolution assessment,
  • consistency assessment,
  • diversity assessment,
  • concentration record,
  • sufficiency rationale,
  • Validation Depth reference,
  • limitations,
  • conditions,
  • adequacy status,
  • version,
  • reassessment triggers,
  • and sufficient lifecycle traceability.


Related Documents