RDPM — Resource Disturbance & Propagation Module
Architecture:
RSGA™ — Resource Sustainability Governance Architecture
Parent Standard:
RIRS — Resource Interdependency & Resilience Standard
Category:
Governance & Enforcement
Subcategory:
Resource Governance
Type:
Core Module
Governed Space:
Resource Disturbance & Propagation Governance
Module ID:
RSGA-RIRS-RDPM-02
Origin ID:
OOF-RSGA-RIRS-RDPM
Version:
1.0
Status:
Canonical Open
Effective Date:
9 October 2026
Compatibility:
Methodology OS — Modular Compatibility
GIE-Compatible:
Yes
AI-Readable:
Yes
Authority:
OOF® — OriginOpen® Foundation
Protection:
Protected Methodological Work
Canonical Language:
English
1. Canonical Definition
RDPM — Resource Disturbance & Propagation Module is the Core Module within RIRS that governs how disturbances affecting Resources, Resource capacities, supporting infrastructure, and operational functions are identified, bounded, evidenced, classified, and traced through Resource interdependency networks to establish their potential or observed propagation pathways, cascading effects, common-cause exposure, and resulting changes in the operational state of affected Resource System components.
RDPM establishes the methodological conditions under which an initial Resource disturbance may be distinguished from its downstream consequences.
It governs the relationship between disturbance origin, affected Resource dependencies, propagation conditions, and the resulting distribution of operational disruption across an interconnected Resource System.
RDPM does not assume that every disturbance propagates, that every propagation pathway produces failure, or that every observed disruption originates from a single identifiable cause.
It also distinguishes a disturbance scenario from an actual operational event.
Disturbance Identified ≠ Propagation Demonstrated.
Potential Propagation Path ≠ Observed Propagation.
Shared Resource Dependency ≠ Common-Cause Failure Established.
Propagation Observed ≠ System Resilience Determined.
2. Operational Role
RDPM governs the identification and traceability of Resource disturbances and their propagation through interconnected Resource Systems.
Its operational role is to establish:
Disturbance identity.
Disturbance origin. Disturbance type. Affected Resource identity. Affected infrastructure. Disturbance magnitude. Disturbance duration. Disturbance timing. Disturbance location. Relevant operational conditions. Initial affected nodes. Direct propagation pathways. Indirect propagation pathways. Conditional propagation pathways. Cascading disturbance sequences. Shared disturbance exposure. Common-cause disturbance relationships. Propagation constraints. Propagation interruption. Propagation uncertainty. Observed operational consequences. Potential downstream consequences. Evidence sufficiency. Disturbance classification. Propagation classification. Monitoring. Reassessment. Downstream vulnerability and resilience handoff.
RDPM does not independently determine Resource criticality, resilience capacity, response authorization, recovery capability, or long-term Sustainability.
3. Core Question
How should Resource disturbances be identified, evidenced, and traced through interconnected Resource dependencies so that their origins, direct and indirect propagation pathways, cascading consequences, common-cause exposure, and affected operational functions remain distinguishable from assumed failures, unsupported causal claims, hypothetical scenarios, or conclusions about the overall resilience of the Resource System?
4. Position in Architecture Governance Flow
RSGA™ Governance Flow
Resource Characterization → Availability & Capacity → Demand → Dependency & Criticality → Access → Prioritization & Allocation → Consumption & Utilization → Scarcity & Constraint → Recovery & Circularity → Substitution & Flexibility → Interdependency & Resilience → Continuity & Sustainability
RIRS Core Module Flow
1. RIDM — Resource Interdependency Mapping Module 2. RDPM — Resource Disturbance & Propagation Module 3. Resource Vulnerability & Resilience Capacity Governance 4. Resource Response & Recovery Governance 5. Resource Resilience Validation & Monitoring Governance
The subsequent three positions describe governed functions; their canonical module names and identifiers are established through their respective final modules.
RDPM occupies the second governance position within RIRS.
It receives the Resource Interdependency Network Profile established through RIDM.
It identifies disturbances and traces their potential or observed effects through that network.
Its outputs support subsequent evaluation of Resource System vulnerability, resilience capacity, response readiness, and recovery capability.
Resource Interdependency Network → Disturbance Identification → Propagation Assessment → Cascading & Common-Cause Assessment → Disturbance Propagation Profile → Vulnerability & Resilience Governance Handoff
5. Governed Space
Resource Disturbance & Propagation Governance
This governed space concerns disturbances affecting interconnected Resource Systems and the pathways through which those disturbances may produce consequences beyond their original Resource or operational location.
It includes:
Disturbance origin. Disturbance characteristics. Affected Resource nodes. Dependency-mediated propagation. Propagation direction. Propagation conditions. Cascading sequences. Common-cause exposure. Propagation boundaries. Observed effects. Potential effects. Evidence and uncertainty. Disturbance monitoring. Propagation reassessment.
It does not independently govern Resource dependency mapping, criticality classification, vulnerability severity, resilience sufficiency, operational response, or recovery execution.
6. Governed Object
The primary Governed Object is:
A Resource Disturbance & Propagation Configuration connecting an identifiable Resource disturbance with its originating Resource or operational condition, affected Resource Interdependency Network, propagation pathways, affected nodes, operational consequences, and supporting evidence within a defined assessment boundary.
A configuration may represent:
An Observed Resource Disturbance
A Defined Disturbance Scenario
A Potential Propagation Pathway
An Observed Propagation Sequence
A Cascading Disruption
A Shared Disturbance Exposure
A Common-Cause Disturbance
An Unresolved Disturbance Relationship
The configuration must preserve the distinction between potential, simulated, inferred, and observed propagation.
7. Scope
RDPM governs:
Disturbance identification. Disturbance source. Disturbance characteristics. Initial affected Resource nodes. Initial affected operational functions. Disturbance boundaries. Direct propagation. Indirect propagation. Conditional propagation. Temporal propagation. Spatial propagation. Cascading disturbance sequences. Shared disturbance exposure. Common-cause disturbance relationships. Propagation amplification. Propagation attenuation. Propagation interruption. Propagation uncertainty. Affected operational functions. Observed operational effects. Potential operational effects. Evidence sufficiency. Causal attribution limitations. Propagation classification. Monitoring. Reassessment. Downstream governance handoffs.
RDPM does not independently determine Resource allocation, operational intervention, resilience sufficiency, recovery success, Harm, Liability, or Sustainability.
8. Foundational Governance Principles
8.1 Disturbance Identity Principle
Resource Disturbance Identified ≠ Resource System Failure Established.
8.2 Propagation Evidence Principle
Potential Propagation ≠ Observed Propagation.
8.3 Causal Traceability Principle
Temporal Sequence ≠ Demonstrated Causation.
8.4 Dependency Boundary Principle
Dependency Path Exists ≠ Disturbance Necessarily Propagates.
8.5 Cascading Integrity Principle
Multiple Disruptions ≠ Cascading Failure Without a Supported Propagation Relationship.
8.6 Common-Cause Integrity Principle
Simultaneous Failures ≠ Common-Cause Failure Automatically Established.
8.7 Operational Reality Principle
Simulated Propagation ≠ Observed Operational Propagation.
8.8 Resilience Separation Principle
Disturbance Propagation Assessed ≠ Resource Resilience Determined.
9. Disturbance Identity
Every RDPM assessment must identify the disturbance or scenario under examination.
Minimum elements include:
Disturbance ID
Disturbance Type
Disturbance Origin
Affected Resource
Affected Infrastructure
Relevant Operational Function
Time
Location
Magnitude Where Applicable
Duration
Operating Conditions
Evidence Basis
The disturbance identity must remain distinguishable from the identity of its consequences.
10. Disturbance Origin
The disturbance origin concerns the Resource, infrastructure, operational condition, or external event from which the assessed disturbance arises.
Origin may be:
Known
Conditionally Established
Inferred
Disputed
Unknown
RDPM must not invent an origin where evidence is insufficient.
11. Origin Integrity
First Observed Failure ≠ Original Disturbance Source.
A downstream failure may be detected before the initiating disturbance is identified.
12. Disturbance Types
Relevant disturbance types may include:
Resource Unavailability
Resource Capacity Reduction
Resource Quality Degradation
Supply Interruption
Infrastructure Failure
Demand Surge
Operational Configuration Failure
Environmental Constraint
Transport Disruption
Control System Failure
Supporting Resource Failure
Combined Resource Disturbance
Each disturbance must remain connected to its operational context.
13. Disturbance Magnitude
Disturbance magnitude concerns the degree of Resource or operational change.
Relevant dimensions may include:
Capacity Reduction
Supply Reduction
Quality Degradation
Duration of Unavailability
Demand Increase
Infrastructure Impairment
Operational Performance Loss
Magnitude must use appropriate Resource-specific units where measurable.
RDPM does not establish a universal disturbance magnitude index.
14. Magnitude Principle
Large Resource Disturbance ≠ Large System Consequence by Default.
System consequences depend on actual dependencies and propagation conditions.
15. Disturbance Duration
RDPM must preserve disturbance duration where material.
Relevant distinctions include:
Instantaneous Disturbance
Short-Duration Disturbance
Extended Disturbance
Intermittent Disturbance
Recurring Disturbance
Persistent Disturbance
Duration classifications must be defined relative to the Resource System and operational function.
16. Duration Principle
Short Disturbance ≠ Negligible Operational Consequence.
A brief interruption may trigger a prolonged downstream disruption.
17. Disturbance Timing
Disturbance timing may affect propagation.
Relevant elements include:
Occurrence Time
Detection Time
Operational State at Occurrence
Demand Conditions
Capacity Conditions
Supporting Resource Conditions
Propagation Delay
Consequence Observation Time
18. Timing Principle
Same Disturbance at Different Times ≠ Same Operational Consequence.
19. Disturbance Location
Location may influence the affected Resource network and propagation pathways.
Relevant dimensions include:
Physical Location
Infrastructure Location
Network Location
Resource Supply Location
Operational Function Location
External Dependency Location
20. Disturbance Boundary
RDPM must define the assessment boundary.
The boundary should identify:
Initial Disturbance
Affected Resource System
Included Dependency Network
Relevant Operational Functions
Temporal Scope
Spatial Scope
Known Exclusions
Evidence Limitations
21. Boundary Principle
Propagation Not Observed Within Boundary ≠ Propagation Absent Outside Boundary.
22. Initial Affected Nodes
The initial affected nodes are the Resource or operational components directly affected by the disturbance.
They may include:
Resource Nodes
Capacity Nodes
Infrastructure Nodes
Operational Function Nodes
Supporting Resource Nodes
RIDM provides the relevant network structure.
23. Initial Impact Integrity
Initial Affected Node ≠ Sole Affected Node.
24. Dependency-Mediated Propagation
Dependency-mediated propagation occurs when a disturbance affects another node through a relevant dependency relationship.
RDPM must establish:
Originating Node
Affected Dependency
Supporting Relationship
Propagation Condition
Downstream Node
Observed or Potential Effect
Evidence Basis
25. Propagation Direction
Propagation direction concerns the sequence in which disturbance effects travel through the Resource network.
It must be evaluated against dependency semantics rather than graphical arrows alone.
Dependency Direction ≠ Propagation Direction Without Context.
26. Direct Propagation
Direct propagation occurs when a disturbance affects an immediately dependent node.
Example:
Electricity Supply Failure → Cooling Equipment Interruption
The propagation relationship must be supported by the relevant operational conditions.
27. Indirect Propagation
Indirect propagation occurs when a disturbance reaches another node through intermediate dependencies.
Example:
Electricity Supply Failure → Cooling Equipment Interruption → Thermal Control Loss → Computing Capacity Reduction
Intermediate nodes must remain identifiable.
28. Indirect Propagation Principle
No Direct Resource Relationship ≠ No Disturbance Propagation Pathway.
29. Conditional Propagation
Conditional propagation occurs only when specified operational conditions are present.
Examples include:
Backup Capacity Unavailable
Demand Above Available Capacity
Alternative Pathway Not Activated
Cooling Requirement Above Threshold
Supporting Infrastructure Impaired
Conditions must remain explicit.
30. Conditional Propagation Principle
Propagation Possible Under Condition A ≠ Propagation Inevitable Under Condition B.
31. Temporal Propagation
Temporal propagation concerns disturbance effects that occur after a delay.
Examples include:
Storage Depletion
Thermal Accumulation
Delayed Material Shortage
Progressive Capacity Reduction
Recovery Resource Exhaustion
RDPM must preserve material delays where evidenced.
32. Temporal Propagation Principle
No Immediate Consequence ≠ No Delayed Consequence.
33. Spatial Propagation
Spatial propagation concerns disturbances affecting Resource systems across locations.
Examples include:
Regional Electricity Supply Interruption
Water Distribution Disruption
Transport Network Failure
Distributed Computing Infrastructure Dependency
Location and network relationships must remain traceable.
34. Spatial Propagation Principle
Geographic Separation ≠ Propagation Independence.
35. Propagation Pathway Identification
Every material propagation pathway should preserve:
Propagation Pathway ID
Originating Disturbance
Initial Affected Node
Intermediate Nodes
Downstream Nodes
Dependency Relationships
Propagation Conditions
Time Sequence
Evidence Basis
Propagation State
36. Propagation Pathway State
A pathway may be classified as:
Potential
Conditionally Supported
Simulated
Inferred
Observed
Partially Observed
Interrupted
Not Supported by Available Evidence
Conflicted
Unknown
Classification must remain evidence-relative.
37. Propagation Pathway Integrity
Pathway Structurally Possible ≠ Pathway Operationally Active.
38. Cascading Disturbance
A cascading disturbance occurs when an initial disturbance produces subsequent disruptions through dependency- mediated relationships.
A cascade may involve:
Sequential Resource Failures
Capacity Reduction
Infrastructure Overload
Demand Redistribution
Supporting Resource Exhaustion
Operational Function Interruption
Secondary Resource Shortage
RDPM must preserve the propagation sequence.
39. Cascade Identity
Every assessed cascade should preserve:
Cascade ID
Initiating Disturbance
Initial Affected Node
Propagation Sequence
Intermediate Disturbances
Affected Operational Functions
Time Sequence
Evidence Basis
Cascade State
40. Cascade Integrity
Multiple Failures in One System ≠ Demonstrated Cascading Failure.
A cascade requires a supported propagation relationship.
41. Cascade Amplification
Cascade amplification occurs where downstream consequences increase the operational significance or extent of the initial disturbance.
Examples include:
Local Capacity Loss Producing Wider Production Interruption
Infrastructure Failure Increasing Demand on Remaining Infrastructure
Cooling Failure Reducing Computing Capacity Across Multiple Systems
Amplification must be evaluated through evidence.
42. Amplification Principle
Disturbance Amplification ≠ Original Disturbance Magnitude Increased.
The disturbance itself may remain unchanged while its consequences expand.
43. Cascade Attenuation
Cascade attenuation occurs where the propagation effect decreases across a dependency pathway.
Relevant conditions may include:
Available Storage
Operational Buffers
Independent Supporting Resources
Reduced Demand
Alternative Resource Arrangements
RDPM records the propagation effect.
It does not independently validate overall resilience capacity.
44. Attenuation Principle
Propagation Attenuated ≠ Resource System Resilience Demonstrated.
45. Propagation Interruption
Propagation interruption occurs where a disturbance pathway ceases to transmit material effects under defined conditions.
Relevant evidence may include:
Operational Isolation
Independent Resource Supply
Available Buffer Capacity
Effective Load Reduction
Alternative Pathway Activation
RDPM must distinguish observed interruption from planned interruption.
46. Interruption Principle
Propagation Interruption Planned ≠ Propagation Interruption Achieved.
47. Shared Disturbance Exposure
Shared disturbance exposure exists where multiple Resource nodes may be affected by the same disturbance source or condition.
Examples include:
Shared Electricity Supply
Shared Water Treatment Infrastructure
Shared Transport Corridor
Shared Cooling Infrastructure
Shared Control Infrastructure
Exposure must remain distinguishable from actual failure.
48. Shared Exposure Principle
Shared Exposure ≠ Simultaneous Failure Established.
49. Common-Cause Disturbance
A common-cause disturbance occurs where a shared originating condition affects multiple Resource arrangements.
Examples include:
One Electrical Infrastructure Failure Affecting Multiple Backup Systems
One Water Treatment Failure Affecting Multiple Water Supply Pathways
One Transport Disruption Affecting Multiple Material Suppliers
RDPM must preserve the common originating condition where evidenced.
50. Common-Cause Integrity
Multiple Failures Occurring Together ≠ Common-Cause Relationship Proven.
51. Common-Cause vs Cascading Disturbance
Common-cause disturbance and cascading disturbance must remain distinct.
Common-Cause Disturbance: Multiple effects arise from a shared originating condition.
Cascading Disturbance: One disturbance produces subsequent effects through dependency-mediated propagation.
A single event may involve both mechanisms.
Common-Cause Failure ≠ Cascading Failure.
52. Multiple Disturbance Origins
A Resource System may experience multiple disturbances with different origins.
RDPM must preserve separate disturbance identities unless evidence supports a common source.
Multiple Disturbances ≠ Single Disturbance Event.
53. Concurrent Disturbances
Concurrent disturbances may affect overlapping Resource pathways.
Relevant elements include:
Disturbance Identity
Occurrence Time
Affected Nodes
Shared Dependencies
Interaction Conditions
Combined Operational Effects
RDPM must not assume causal interaction merely because disturbances overlap in time.
54. Concurrent Disturbance Principle
Concurrent Disturbances ≠ Causally Connected Disturbances.
55. Disturbance Interaction
Disturbances may interact through:
Shared Resource Capacity
Dependency Overlap
Infrastructure Constraints
Demand Redistribution
Operational State Changes
Resource Depletion
Response Resource Competition
Interaction must be supported by evidence or explicitly bounded as a scenario assumption.
56. Disturbance Interaction Principle
Combined Disturbance Consequence ≠ Sum of Independent Disturbance Consequences by Default.
Interactions may amplify, reduce, or alter effects.
57. Affected Operational Functions
RDPM must identify operational functions affected by propagation.
Relevant elements include:
Function Identity
Supporting Resource Dependencies
Disturbance Pathway
Observed Functional Change
Potential Functional Change
Time
Evidence
RDPM does not independently determine final functional criticality.
58. Operational Consequence Recognition
Operational consequences may include:
Function Interruption
Capacity Reduction
Quality Degradation
Delayed Operation
Supporting Resource Exhaustion
Infrastructure Impairment
Operational Configuration Change
Consequences must remain attributable to the relevant disturbance evidence.
59. Consequence Integrity
Operational Consequence Observed ≠ Disturbance Cause Established.
60. Potential vs Observed Consequences
RDPM must distinguish:
Potential Consequence
Scenario-Based Consequence
Simulated Consequence
Inferred Consequence
Observed Consequence
Unverified Consequence
Conflicted Consequence
Unknown Consequence
61. Evidence Provenance
Disturbance and propagation evidence should preserve:
Evidence ID
Evidence Source
Origin
Collection Method
Time
Location
Affected Resource
Affected Node
Relevant Pathway
Observed Condition
Evidence Limitations
Version:
62. Causal Evidence
Causal evidence may include:
Operational Logs
Measured Resource Flows
Infrastructure Events
Time-Synchronized Observations
System State Changes
Technical Investigations
Validated Operational Models
Other Relevant Evidence
Causal conclusions must remain proportional to evidence.
63. Causal Integrity
Correlation ≠ Causation.
Temporal Sequence ≠ Causal Proof.
Shared Disturbance Timing ≠ Shared Disturbance Origin.
64. Simulation Evidence
Simulation may support the evaluation of potential disturbance propagation.
Relevant elements include:
Simulation Model
Scenario Assumptions
Resource Network Representation
Disturbance Input
Propagation Logic
Output
Validation Status
Uncertainty
Simulation governance remains within its applicable architecture.
65. Simulation Boundary
Simulated Propagation ≠ Observed Propagation.
Simulation results must not be represented as operational observations.
66. Unknown Propagation Relationships
RDPM must support explicit unknown states.
Examples include:
Unknown Disturbance Origin
Unknown Propagation Pathway
Unknown Intermediate Node
Unknown Propagation Condition
Unknown Consequence
Unknown Causal Relationship
Unknown relationships must not be silently converted into absence.
67. Unknown Propagation Principle
Propagation Not Established ≠ Propagation Impossible.
68. Evidence Conflict
Disturbance evidence may conflict.
Examples include:
Different Sources Identify Different Origins
Observed Timing Conflicts with Proposed Propagation
Infrastructure Logs Conflict with Operational Reports
Simulation Conflicts with Observed Behavior
Multiple Causal Explanations Remain Plausible
Conflicts must remain traceable.
69. Evidence Conflict Principle
Conflicting Evidence ≠ Validated Propagation Conclusion.
70. Resource Disturbance & Propagation Profile
The principal governed output is the:
Resource Disturbance & Propagation Profile
It establishes the evidence-based relationship between a Resource disturbance, the affected Resource Interdependency Network, potential or observed propagation pathways, cascading effects, common-cause relationships, operational consequences, uncertainty, and reassessment conditions.
The profile provides the disturbance foundation for subsequent vulnerability and resilience governance.
71. Minimum Profile Fields
At minimum:
Disturbance Propagation Profile ID
Resource System ID
Resource Interdependency Network Reference
Disturbance ID
Disturbance Type
Disturbance Origin
Origin State
Initial Affected Resource
Initial Affected Node
Disturbance Magnitude
Disturbance Duration
Disturbance Timing
Disturbance Location
Assessment Boundary
Operating Conditions
Affected Dependency Relationships
Direct Propagation Pathways
Indirect Propagation Pathways
Conditional Propagation Pathways
Temporal Propagation References
Spatial Propagation References
Propagation Sequence
Propagation State
Cascading Disturbance References
Cascade Amplification References
Cascade Attenuation References
Propagation Interruption References
Shared Disturbance Exposure
Common-Cause Disturbance References
Multiple Origin References
Concurrent Disturbance References
Disturbance Interaction References
Affected Operational Functions
Potential Operational Consequences
Observed Operational Consequences
Evidence Provenance
Causal Evidence State
Evidence Sufficiency
Missing Evidence
Evidence Uncertainty
Evidence Conflict
Reassessment Trigger
Effective Time
Version:
72. Minimum Implementation Framework
A minimum operational RDPM implementation should contain ten governed layers.
Layer 1 — Disturbance Identity
Establish the disturbance or scenario identity, type, origin, affected Resource, timing, location, and relevant operating conditions.
Layer 2 — Network Reference
Connect the disturbance to the applicable Resource Interdependency Network Profile established through RIDM.
Layer 3 — Initial Impact Identification
Identify the initial affected nodes, Resource capacities, infrastructure, and operational functions.
Layer 4 — Propagation Pathway Assessment
Identify direct, indirect, conditional, temporal, and spatial propagation pathways.
Layer 5 — Cascading Disturbance Assessment
Evaluate sequential disturbance relationships, propagation amplification, attenuation, and interruption.
Layer 6 — Shared & Common-Cause Assessment
Identify shared disturbance exposure, common-cause relationships, and multiple disturbance origins.
Layer 7 — Operational Consequence Assessment
Preserve affected operational functions and distinguish potential, inferred, simulated, and observed consequences.
Layer 8 — Evidence & Causal Validation
Evaluate evidence provenance, causal sufficiency, unknown relationships, conflicting evidence, and uncertainty.
Layer 9 — Propagation Classification
Establish evidence-based propagation states without determining overall Resource resilience.
Layer 10 — Governed Output & Handoff
Produce the Resource Disturbance & Propagation Profile and preserve downstream vulnerability and resilience governance references.
73. Minimum Decision States
At minimum:
Disturbance Not Identified
Disturbance Identified
Origin Pending
Origin Identified
Origin Inferred
Origin Disputed
Origin Unknown
Network Reference Pending
Initial Affected Nodes Identified
Propagation Assessment Pending
Potential Propagation Identified
Conditional Propagation Identified
Simulated Propagation
Inferred Propagation
Observed Propagation
Partially Observed Propagation
Propagation Interrupted
Cascade Potential Identified
Cascade Observed
Common-Cause Exposure Identified
Common-Cause Relationship Supported
Operational Consequences Identified
Evidence-Limited
Conflicted
Unknown
Reassessment Required
74. Minimum Evidence Path
Where disturbance propagation cannot be established:
Disturbance Identity → Resource Interdependency Network Reference → Initial Affected Nodes → Candidate Propagation Pathways → Operational Evidence → Evidence-Limited / Conflicted / Unknown State → Missing Evidence Identification → Evidence Acquisition → Causal & Propagation Reassessment → Propagation Classification → Resource Disturbance & Propagation Profile → Vulnerability & Resilience Governance Handoff
Missing evidence must not be replaced by assumed causal relationships.
75. Minimum Reassessment Framework
Current Resource Disturbance & Propagation Profile → New Disturbance / Operational / Network / Causal Evidence → Materiality Assessment → Origin Review → Initial Impact Review → Propagation Pathway Review → Cascade Review → Common-Cause Review → Consequence Review → Evidence State Update → Propagation Classification Update → Profile Update → Version Update
Reassessment may be triggered by:
New disturbance evidence. Changed disturbance origin. Changed Resource network. Newly identified dependency pathways. New shared dependencies. New operational consequences. Newly observed cascading effects. New common-cause evidence. Changed Resource capacity. Changed operating conditions. Changed disturbance duration. Conflicting causal evidence. Newly identified delayed effects. New simulation or operational test evidence. Previously unknown propagation pathways.
76. Governance Requirements
A conforming RDPM implementation must satisfy the following requirements.
Disturbance Identity
1. Identify the disturbance or scenario. 2. Preserve disturbance type. 3. Preserve disturbance origin where established. 4. Support inferred origin states. 5. Support disputed origin states. 6. Support unknown origin states. 7. Preserve disturbance timing. 8. Preserve disturbance location. 9. Preserve magnitude where applicable. 10. Preserve duration. 11. Preserve operating conditions. 12. Prevent first observed failure from automatically establishing disturbance origin.
Network & Initial Impact
13. Preserve the Resource Interdependency Network reference. 14. Identify initial affected nodes. 15. Preserve affected Resource identities.
16. Preserve affected infrastructure. 17. Preserve relevant operational functions. 18. Define the assessment boundary. 19. Preserve known exclusions. 20. Prevent bounded observations from establishing universal absence of propagation.
Propagation Governance
21. Identify direct propagation pathways. 22. Identify indirect propagation pathways. 23. Identify conditional propagation pathways. 24. Identify temporal propagation pathways. 25. Identify spatial propagation pathways. 26. Preserve propagation direction. 27. Preserve intermediate nodes. 28. Preserve propagation conditions. 29. Preserve propagation timing. 30. Distinguish potential from observed propagation. 31. Distinguish simulated from observed propagation. 32. Prevent network connectivity from automatically establishing propagation.
Cascading Disturbance Governance
33. Identify potential cascading sequences. 34. Preserve observed cascading sequences. 35. Preserve intermediate disturbance relationships. 36. Identify amplification conditions. 37. Identify attenuation conditions. 38. Identify propagation interruption. 39. Preserve relevant evidence. 40. Prevent multiple failures from automatically establishing a cascade. 41. Prevent planned interruption from establishing achieved interruption.
Common-Cause & Multiple Disturbance Governance
42. Identify shared disturbance exposure. 43. Identify potential common-cause conditions. 44. Preserve supported common-cause relationships. 45. Preserve multiple disturbance origins. 46. Identify concurrent disturbances. 47. Preserve disturbance interaction conditions. 48. Distinguish common-cause from cascading disturbance. 49. Prevent simultaneous failures from automatically establishing common causation. 50. Prevent concurrent disturbances from automatically establishing causal interaction.
Operational Consequence Governance
51. Identify affected operational functions. 52. Preserve potential consequences. 53. Preserve simulated consequences. 54. Preserve inferred consequences. 55. Preserve observed consequences. 56. Preserve consequence timing. 57. Preserve consequence evidence. 58. Prevent observed consequences from automatically establishing disturbance cause.
Evidence Governance
59. Preserve evidence provenance. 60. Preserve evidence collection methods. 61. Evaluate causal evidence sufficiency. 62. Preserve missing evidence. 63. Support Evidence-Limited states. 64. Support Conflicted states.
65. Support Unknown states. 66. Preserve material uncertainty. 67. Distinguish correlation from causation. 68. Distinguish temporal sequence from causal proof. 69. Preserve simulation assumptions. 70. Prevent simulation results from being represented as operational observations.
Lifecycle Governance
71. Support disturbance monitoring. 72. Preserve material propagation changes. 73. Preserve new causal evidence. 74. Preserve changed network references. 75. Support reassessment. 76. Preserve reassessment triggers. 77. Preserve effective time. 78. Preserve material version history. 79. Prevent historical propagation findings from automatically establishing current conditions.
Architecture: Boundaries
80. Maintain RIDM network mapping boundaries. 81. Maintain RDCS dependency and criticality boundaries. 82. Maintain RACS availability and capacity boundaries. 83. Maintain RDGS demand governance boundaries. 84. Maintain RSCS scarcity and constraint boundaries. 85. Maintain RSFS substitution and flexibility boundaries. 86. Preserve downstream vulnerability governance handoffs. 87. Preserve downstream resilience capacity governance handoffs. 88. Preserve downstream response and recovery governance handoffs. 89. Prevent disturbance propagation assessment from creating operational authority. 90. Prevent propagation assessment from establishing resilience sufficiency. 91. Prevent propagation assessment from determining Harm or Liability. 92. Prevent propagation assessment from establishing Sustainability. 93. Produce a Resource Disturbance & Propagation Profile.
77. Governance Logic
Canonical RDPM logic:
Resource Disturbance Identity → Resource Interdependency Network Reference → Initial Affected Nodes → Disturbance Characteristics & Conditions → Direct / Indirect / Conditional Propagation → Temporal & Spatial Propagation → Cascading Disturbance Assessment → Amplification / Attenuation / Interruption → Shared Disturbance Exposure → Common-Cause & Multiple Origin Assessment → Operational Consequence Recognition → Causal Evidence Evaluation → Propagation Classification → Resource Disturbance & Propagation Profile → Monitoring & Reassessment → Vulnerability & Resilience Governance Handoff
78. Governance Outputs
RDPM may produce:
Resource Disturbance & Propagation Profile
Disturbance Identity Record
Disturbance Origin Record
Disturbance Type Record
Disturbance Magnitude Record
Disturbance Duration Record
Disturbance Timing Record
Disturbance Location Record
Disturbance Boundary Record
Initial Affected Node Register
Affected Resource Register
Affected Infrastructure Register
Direct Propagation Pathway Map
Indirect Propagation Pathway Map
Conditional Propagation Record
Temporal Propagation Record
Spatial Propagation Record
Propagation Sequence Record
Propagation State
Cascading Disturbance Assessment
Cascade Amplification Record
Cascade Attenuation Record
Propagation Interruption Record
Shared Disturbance Exposure Record
Common-Cause Disturbance Assessment
Multiple Disturbance Origin Record
Concurrent Disturbance Record
Disturbance Interaction Record
Affected Operational Function Register
Potential Consequence Record
Observed Consequence Record
Causal Evidence Record
Evidence Sufficiency State
Missing Evidence Record
Evidence Uncertainty
Evidence Conflict
Reassessment Trigger
Downstream Governance Handoff
Version:
79. Practical Applications
AI Data Centers
Tracing how electricity, cooling, water, and computing infrastructure disturbances may propagate across dependent operational functions.
Energy Infrastructure
Evaluating how generation, transmission, distribution, storage, and supporting infrastructure disturbances may affect interconnected Resource systems.
Water Systems
Tracing disturbances affecting water sources, pumping, treatment, electricity supply, storage, and distribution.
Industrial Manufacturing
Evaluating how material shortages, electricity failures, transport disruptions, and equipment-related Resource disturbances may propagate through production dependencies.
Critical Infrastructure
Identifying potential and observed cascading disturbances, common-cause exposure, and affected essential operational functions.
80. Use Case 1 — AI Data Center Electricity Disturbance
An AI data center experiences a primary electricity supply interruption.
The facility depends on electricity for computational processing and cooling infrastructure.
RDPM establishes:
Disturbance: Primary electricity supply interruption.
Origin: Electrical supply infrastructure, subject to evidence.
Initial Affected Node: Primary electricity supply.
Resource Interdependency Network: Electricity, computing infrastructure, cooling infrastructure, water systems, backup energy, and supporting equipment.
Direct Propagation: Electricity interruption may affect computing equipment and cooling systems.
Indirect Propagation: Cooling interruption may produce thermal constraints and subsequent computing capacity reduction.
Conditional Propagation: The downstream effect depends on backup capacity, activation conditions, cooling configuration, and operating load.
Potential Cascade: Electricity interruption → Cooling capacity reduction → Thermal constraint → Computing capacity reduction.
Shared Disturbance Exposure: Computing and cooling may depend on common electrical infrastructure.
Common-Cause Condition: Shared electrical infrastructure failure may affect multiple Resource arrangements.
Evidence Requirement: Distinguish observed interruptions from simulated or inferred consequences.
Output: Resource Disturbance & Propagation Profile.
RDPM traces the disturbance and its consequences.
It does not independently conclude that the data center is resilient or non-resilient.
Electricity Failure Observed ≠ Every Downstream Failure Automatically Proven.
81. Use Case 2 — Industrial Water Supply Disturbance
An industrial facility depends on water for production and electricity for pumping and treatment.
The facility experiences a disruption affecting electrical infrastructure.
RDPM establishes:
Disturbance: Electricity supply interruption.
Initial Affected Node: Electrical distribution infrastructure.
Direct Propagation: Pumping and treatment equipment may lose operational capacity.
Indirect Propagation: Water availability may decline, affecting production functions.
Temporal Propagation: Water storage may delay operational consequences.
Conditional Propagation: Production interruption depends on storage capacity, demand, alternative supply, and operational requirements.
Potential Cascade: Electricity interruption → Pumping failure → Water supply reduction → Production capacity reduction.
Shared Exposure: Primary and alternative water pathways may rely on the same electricity infrastructure.
Evidence Requirement: Preserve the actual observed sequence and distinguish it from a hypothetical scenario.
Output: Resource Disturbance & Propagation Profile.
A Resource disturbance may propagate through several intermediate dependencies before affecting the final operational function.
Initial Resource Failure ≠ Final Operational Consequence Without a Supported Propagation Pathway.
82. Critical Distinctions
Disturbance Identified ≠ Propagation Demonstrated.
Potential Propagation Path ≠ Observed Propagation.
Shared Resource Dependency ≠ Common-Cause Failure Established.
Propagation Observed ≠ System Resilience Determined.
Resource Disturbance Identified ≠ Resource System Failure Established.
Temporal Sequence ≠ Demonstrated Causation.
Dependency Path Exists ≠ Disturbance Necessarily Propagates.
Multiple Disruptions ≠ Cascading Failure Without a Supported Propagation Relationship.
Simultaneous Failures ≠ Common-Cause Failure Automatically Established.
Simulated Propagation ≠ Observed Operational Propagation.
First Observed Failure ≠ Original Disturbance Source.
Large Resource Disturbance ≠ Large System Consequence by Default.
Short Disturbance ≠ Negligible Operational Consequence.
Same Disturbance at Different Times ≠ Same Operational Consequence.
Propagation Not Observed Within Boundary ≠ Propagation Absent Outside Boundary.
Initial Affected Node ≠ Sole Affected Node.
Dependency Direction ≠ Propagation Direction Without Context.
No Direct Resource Relationship ≠ No Disturbance Propagation Pathway.
Propagation Possible Under Condition A ≠ Propagation Inevitable Under Condition B.
No Immediate Consequence ≠ No Delayed Consequence.
Geographic Separation ≠ Propagation Independence.
Pathway Structurally Possible ≠ Pathway Operationally Active.
Multiple Failures in One System ≠ Demonstrated Cascading Failure.
Disturbance Amplification ≠ Original Disturbance Magnitude Increased.
Propagation Attenuated ≠ Resource System Resilience Demonstrated.
Propagation Interruption Planned ≠ Propagation Interruption Achieved.
Shared Exposure ≠ Simultaneous Failure Established.
Multiple Failures Occurring Together ≠ Common-Cause Relationship Proven.
Common-Cause Failure ≠ Cascading Failure.
Multiple Disturbances ≠ Single Disturbance Event.
Concurrent Disturbances ≠ Causally Connected Disturbances.
Combined Disturbance Consequence ≠ Sum of Independent Disturbance Consequences by Default.
Operational Consequence Observed ≠ Disturbance Cause Established.
Correlation ≠ Causation.
Temporal Sequence ≠ Causal Proof.
Shared Disturbance Timing ≠ Shared Disturbance Origin.
Propagation Not Established ≠ Propagation Impossible.
Conflicting Evidence ≠ Validated Propagation Conclusion.
83. Cross-Architecture Boundary
RDPM may consume evidence from:
RIDM — Resource Interdependency Mapping Module
RCHS — Resource Characterization Standard
RACS — Resource Availability & Capacity Standard
RDGS — Resource Demand Governance Standard
RDCS — Resource Dependency & Criticality Standard
RAGS — Resource Access Governance Standard
RPAS — Resource Prioritization & Allocation Standard
RCUS — Resource Consumption & Utilization Standard
RSCS — Resource Scarcity & Constraint Standard
RRCS — Resource Recovery & Circularity Standard
RSFS — Resource Substitution & Flexibility Standard
Its outputs support subsequent RIRS governance of:
Resource Vulnerability & Resilience Capacity
Resource Response & Recovery
Resource Resilience Validation & Monitoring
Its downstream architecture relationship includes:
RCSS — Resource Continuity & Sustainability Standard
Relevant external architecture relationships may include:
ORA™ — Operational Reality Architecture
PGA™ — Prediction Governance Architecture
SIMULOS® — Simulation Governance
HAGA™ — Harm Governance Architecture
LIGA™ — Liability Governance Architecture
RDPM governs Resource disturbance and propagation.
It does not absorb Resource dependency mapping, Resource criticality, operational authorization, resilience sufficiency, recovery execution, Harm, Liability, or Sustainability governance.
84. Cross-Architecture Mechanism Principle
An operational mechanism may produce inputs for multiple governance architectures, but it belongs only to the architecture whose governed domain includes that mechanism itself. Other architectures govern only its domain- specific relevance or consequences.
RDPM may use Resource network, operational observation, capacity, scarcity, and disturbance evidence.
It governs the relevance of those inputs to Resource disturbance identity, propagation pathways, cascading effects, and common-cause exposure.
It does not redefine the independent mechanisms that produced them.
85. Canonical Boundary
RDPM governs how disturbances affecting Resources, Resource capacities, supporting infrastructure, and operational functions are identified, bounded, evidenced, classified, and traced through Resource interdependency networks to establish their potential or observed propagation pathways, cascading effects, common-cause exposure, and resulting changes in the operational state of affected Resource System components.
It does not independently determine Resource criticality, vulnerability severity, resilience capacity, operational response authority, recovery success, Harm, Liability, or Sustainability.
Its principal governed output is the Resource Disturbance & Propagation Profile .
86. Canonical Closing Statement
A Resource disturbance cannot be understood solely through its point of origin. Its operational significance emerges through the dependency pathways, shared infrastructure, timing conditions, and Resource relationships that determine whether the disturbance remains contained or produces consequences across the wider Resource System.
RDPM establishes the governance conditions under which those consequences become traceable and evidentially distinguishable — ensuring that potential propagation is not presented as observed failure, simultaneous disruptions are not automatically treated as common-cause events, and cascading effects are not asserted without a supported causal pathway.