Retirement Planning Module (RPM)
OOF® Origin Open Foundation®
Independent Methodological Authority
Architecture: SLGA™ — Software Lifecycle Governance Architecture
Parent Standard: Software Retirement Standard (SRTS)
Category: Governance & Enforcement
Subcategory: Software Retirement Governance
Type: Core Module
Governed Space: Software Retirement Planning Governance
Module ID: SLGA-SRTS-RPM-01
Origin ID: OOF-SLGA-SRTS-RPM
Version: 1.0
Status: Canonical Open
Effective Date: 15.10.2026
Compatibility: Methodology OS — Modular Compatibility
GIE-Compatible: Yes
AI-Readable: Yes
Authority: OOF® — OriginOpen® Foundation
Protection: Protected Methodological Work
Canonical Language: UCL — Universal Canonical Language (English)
Canonical Definition
Retirement Planning Module (RPM) is the Core Module within SoftwareRetirement Standard (SRTS) that governs how proposed, required, or
emerging software retirement activities are identified, justified,
scoped, evaluated, structured, and prepared for controlled lifecycle
transition.
RPM establishes software retirement planning as an evidence-supported
governance process connecting an identifiable software object, itscurrent lifecycle and operational conditions, the reasons for
retirement, its intended retirement state, affected dependencies,
applicable authority, required transition activities, and conditions
for retirement readiness.
The module distinguishes a retirement proposal from a retirement decision,
retirement justification from retirement feasibility, retirementplanning from retirement execution, and planned withdrawal from
verified operational retirement.
It requires retirement plans to account for the actual software
environment, including active and historical versions, deploymentlocations, operational functions, users, dependent systems, support
conditions, data relationships, security implications, migration
requirements, and residual obligations.
RPM recognizes that software retirement may be immediate, phased,
partial, conditional, replacement-dependent, or constrained by
continuing operational responsibilities.
It governs the establishment of retirement pathways that are
proportionate to the software's operational significance and the
consequences of its withdrawal.
RPM applies to enterprise applications, software services, libraries,
infrastructure components, embedded software, firmware, AI systems,autonomous agents, and software operating within industrial or
critical infrastructure environments.
Its principal governance output is the Software Retirement Plan
Profile.
Operational Role
RPM establishes the initial planning and readiness foundation for governed
software retirement.It governs:
- Retirement initiation
- Retirement case identity
- Retirement origin
- Software object identification
- Retirement purpose
- Retirement justification
- Current-state assessment
- Intended retirement state
- Retirement scope
- Retirement boundaries
- Operational significance
- Retirement impact
- Retirement feasibility
- Retirement alternatives
- Retirement dependencies
- Affected users and systems
- Support and maintenance conditions
- Migration requirements
- Data continuity requirements
- Operational continuity
- Security considerations
- Retirement sequencing
- Authority requirements
- Retirement resources
- Retirement readiness
- Retirement uncertainty
- Retirement plan approval
- Planning evidence
- Planning revisions
- Handoff to subsequent retirement governance
RPM does not execute software withdrawal or independently verify
retirement completion.
Operational Question
How can the retirement of an identifiable software object be plannedthrough a justified, feasible, evidence-supported, and appropriately
authorized transition pathway when its dependencies, operational
functions, support conditions, data relationships, affected users, and
residual obligations may extend beyond its intended withdrawal?
Position in Architecture Governance Flow
SLGA™ Governance Flow
Software Requirements → Software Creation → Software Dependencies →
Software Configuration → Software Quality → Software Security →Software Release → Software Deployment → Software Change Management →
Software Retirement
Cross-cutting: Software Lifecycle Control
SRTS Core Module Flow
Retirement Planning Module (RPM) → End-of-Support Management Module
(ESMM) → Software Migration Module (SMM) → Residual DependencyManagement Module (RDMM) → Retirement Closure Control Module (RCCLM)
RPM is the first Core Module within SRTS.
It establishes the retirement plan and initial governance conditions
required for subsequent support transition, migration, residualdependency management, and retirement closure.
Its planning conclusions must remain subject to reassessment when the
actual software or operational environment materially changes.
- Governed Space
Software Retirement Planning Governance
This governed space concerns the structured preparation of software
retirement before material withdrawal or transition activities areperformed.
It begins when a software object becomes subject to a retirement
proposal, requirement, or identified need for discontinuation.
It includes the identification of the retiring software, its existing role,
applicable obligations, retirement objectives, dependencies,feasibility, transition requirements, and readiness conditions.
It concludes its initial planning phase when an evidence-supported
retirement pathway has been established and appropriately accepted or
authorized for subsequent governance.
The governed space remains applicable whenever material changes require the
retirement plan to be revised.Governed Object
The primary Governed Object is:A Software Retirement Planning Case representing the evidence-supported
relationship between an identifiable software object, its currentlifecycle and operational state, retirement purpose, intended
retirement condition, affected dependencies, applicable constraints,
proposed transition activities, authority requirements, and retirement
readiness criteria.
The governed object must preserve, where applicable:
Retirement Planning Case ID
Software Object ID
Software Product or Component Reference
Current Software State
Retirement Origin
Retirement Purpose
Retirement Justification
Intended Retirement State
Retirement Scope
Affected Environments
Affected Dependencies
Operational Requirements
Support Conditions
Migration Requirements
Data Continuity Requirements
Retirement Constraints
Authority References
Retirement Readiness Conditions
Plan Status
Plan Version
Scope
RPM governs:Retirement Case Formation
Retirement Origin Recognition
Software Identity Assessment
Retirement Purpose Definition
Retirement Justification
Current-State Identification
Intended-State Definition
Retirement Scope Formation
Retirement Boundary Definition
Operational Significance Assessment
Retirement Impact Identification
Retirement Feasibility Assessment
Retirement Alternative Evaluation
Dependency Identification
Migration Requirement Identification
Support Transition Planning
Data Continuity Planning
Operational Continuity Planning
Retirement Sequencing
Resource and Capability Readiness
Retirement Authority Alignment
Retirement Plan Validation
Retirement Readiness Assessment
Plan Revision and Reassessment
RPM does not replace specialized lifecycle standards responsible forimplementing the activities identified by the retirement plan.
Foundational Principle
Software retirement must be planned according to the actualoperational role, dependencies, obligations, and consequences of the
software being withdrawn—not merely according to the organization's
intention to stop using or supporting it.
The existence of a retirement objective does not establish retirement
feasibility.
The availability of replacement software does not establish migration
readiness.
The approval of a retirement plan does not establish authority for
every action required to execute it.
Retirement Intention ≠ Retirement Readiness.
Retirement Plan Approved ≠ Withdrawal Authorized.
Retirement Planning Case Identity
Every retirement planning case must have a stable identity.Relevant elements include:
Planning Case ID
Retirement Case Reference
Software Object ID
Planning Origin
Responsible Planning Function
Creation Time
Applicable Software State
Planning Status
Evidence Reference
Plan Version
The planning identity must remain stable across revisions andsubsequent retirement activities.
Retirement Initiation
Retirement planning may be initiated by:Support Termination Notice
Technology Obsolescence
Security Finding
Maintenance Infeasibility
Replacement Availability
Operational Redundancy
Infrastructure Transition
Architectural Consolidation
External Requirement
Cost Sustainability Concern
Dependency Discontinuation
Safety or Reliability Concern
Organizational Decision
Automated Recommendation
Initiation must remain distinguishable from approval to retire thesoftware.
Retirement Origin
RPM must preserve the originating condition that created the need orproposal for retirement.
Relevant elements include:
Originating Actor or System
Originating Event
Affected Software
Observed Condition
Supporting Evidence
Initial Urgency
Known Constraints
Origin Time
The retirement origin must remain traceable throughout the planningprocess.
Retirement Purpose
The retirement purpose must identify the intended governance outcome.Potential purposes include:
Eliminate Unsupported Software
Reduce Security Exposure
Remove Redundant Functionality
Replace Obsolete Software
Consolidate Services
Improve Operational Sustainability
Terminate an Unnecessary Capability
Complete Technology Migration
Reduce Dependency Complexity
Fulfill an External Obligation
A retirement purpose must not be reduced to an implementationinstruction such as deleting an application or disabling a service.
Retirement Justification
RPM must establish why retirement is proposed or required.Relevant considerations include:
Current Software Condition
Operational Necessity
Support Availability
Maintenance Feasibility
Security Exposure
Replacement Suitability
Dependency Consequences
Economic Sustainability
External Requirements
Risks of Continued Operation
The justification must be evidence-supported and distinguishable fromthe decision to execute retirement.
Software Object Identification
RPM must identify the software object subject to retirement.Potential objects include:
Application
Software Product
Software Service
Software Version
Library
Component
Runtime
Interface
Firmware
Automated Workflow
AI Model Service
Autonomous Agent Component
Embedded Software Capability
The identity must distinguish the retiring object from software thatremains active.
Software Identity Precision
Software retirement planning must establish sufficient identityprecision.
Relevant elements include:
Product Name
Software Object ID
VersionBuild
Artifact Reference
Configuration
Deployment Environment
Runtime Location
Ownership Reference
Dependency Relationships
A product name alone may be insufficient when multiple versions orinstances remain operational.
Current Lifecycle State
RPM must establish the software's current lifecycle condition.Potential states include:
Active Development
Maintained
Supported
Deployed
Operational
Restricted
Unsupported but Operational
Migration Pending
Partially Withdrawn
Previously Declared Retired
The planning process must not assume that an administrative lifecyclestate accurately represents operational reality.
Current Operational State
RPM must identify how the software is actually used.Relevant elements include:
Operational Function
Active Environments
Active Users
Dependent Systems
Data Processing
External Interfaces
Scheduled Execution
Automated Tasks
Security Permissions
Physical-System Interaction
Known Operational Restrictions
Actual operational use must be supported by appropriate evidence.Intended Retirement State
RPM must define the intended resulting condition.Potential outcomes include:
Software No Longer Distributed
Software No Longer Supported
Software No Longer Maintained
Software No Longer Deployed
Software No Longer Executing
Operational Function Replaced
Data Migrated
Interfaces Withdrawn
Dependencies Resolved
Historical Artifact Retained Without Operational Use
Retired With Explicit Residual Obligations
The intended retirement state must be sufficiently precise to supportlater verification.
Current–Intended State Difference
RPM must identify the transition required between the current andintended software states.
Relevant elements include:
Current Software Role
Target Software Role
Current Support Conditions
Target Support Conditions
Current Operational Dependencies
Target Dependency State
Current Data Relationships
Target Data State
Current Access Permissions
Target Authority State
This comparison establishes the initial retirement transitionrequirements.
Retirement Scope
Retirement scope must identify what the proposed retirement includes.Relevant elements include:
Software Products
Software Versions
Software Components
Services
Interfaces
Deployment Environments
User Groups
Data Relationships
Support Obligations
Maintenance Obligations
External Integrations
Scope must distinguish complete retirement from partial orenvironment-specific retirement.
Retirement Boundary
RPM must establish the boundaries of the retirement case.Relevant boundaries include:
Software Object Boundary
Version Boundary
Environment Boundary
Operational Boundary
Dependency Boundary
Data Boundary
Interface Boundary
Authority Boundary
Support Boundary
Historical Evidence Boundary
Excluded objects must remain visible where they are materiallyaffected by the retirement.
Partial Retirement Planning
Retirement may concern only part of a software environment.Examples include:
Retirement of One Version
Withdrawal From One Region
Discontinuation of One Interface
Removal From One Customer Environment
Retirement of One Firmware Variant
Termination of One Service Capability
RPM must preserve the continuing governance status of software outsidethe retirement scope.
Retirement Significance
RPM must assess the governance significance of the proposedretirement.
Relevant factors include:
Operational Criticality
Affected Users
Dependency Complexity
Data Continuity
Security Exposure
Migration Complexity
Replacement Availability
Recovery Requirements
External Obligations
Physical-System Consequences
Retirement significance must reflect actual consequences rather thansoftware age alone.
Retirement Impact Assessment
RPM must identify the material consequences of retirement.Potential dimensions include:
Functional Impact
Operational Impact
Dependency Impact
Security Impact
Data Impact
Interface Impact
User Impact
Economic Impact
Continuity Impact
Recovery Impact
External System Impact
Impact assessment must identify uncertainties requiring furtherspecialized analysis.
Direct Retirement Impact
Direct impact concerns the immediate consequences of withdrawing the
identified software object.Examples include:
Loss of Software Functionality
Termination of Service Availability
Removal of User Access
Discontinuation of Maintenance
Withdrawal of an Interface
Termination of Automated Execution
Direct impact must be associated with the defined retirement scope.Indirect Retirement Impact
Indirect impact concerns consequences propagated through dependenciesor operational relationships.
Examples include:
Dependent Application Failure
Loss of Historical Data Access
Broken External Integration
Disrupted Business Process
Unavailable Recovery Function
Physical Equipment Incompatibility
Unexpected Security Exposure
Indirect impact must not be ignored merely because the dependentsystem is outside the immediate retirement scope.
Dependency Discovery
RPM must identify dependencies relevant to retirement planning.Potential categories include:
Direct Dependencies
Transitive Dependencies
Runtime Dependencies
Infrastructure Dependencies
External Service Dependencies
Data Dependencies
Interface Dependencies
Operational Process Dependencies
Physical-System Dependencies
Dependency discovery must include relationships in both directions.Upstream Dependencies
Upstream dependencies are resources required by the retiring software.Relevant elements include:
Libraries
Databases
Runtime Platforms
External APIs
Infrastructure Services
Authentication Systems
Configuration Services
Monitoring Systems
RPM must identify which upstream dependencies can be retired and whichremain necessary for other software.
Downstream Dependencies
Downstream dependencies are systems, users, or processes relying onthe retiring software.
Relevant elements include:
Dependent Applications
External Customers
Integration Partners
Automated Workflows
Data Consumers
Business Processes
Industrial Equipment
Robotic Systems
Recovery Processes
Downstream dependencies must be addressed before withdrawal readinesscan be established.
Dependency Uncertainty
RPM must preserve uncertainty where dependency relationships areincomplete or insufficiently verified.
Potential conditions include:
Unknown Consumers
Undocumented Interfaces
Unverified Scheduled Tasks
Unmapped Data Relationships
Legacy Integration Uncertainty
Unknown Recovery Dependencies
Unverified Physical-System Dependencies
Material uncertainty may prevent retirement readiness.Support Condition Assessment
RPM must identify relevant support conditions.Relevant elements include:
Support Provider
Supported Version
Support Scope
Support End Date or Condition
Security Update Availability
Technical Assistance Availability
Extended Support Options
Continuing Operational Use
External Support Obligations
These conditions establish requirements for ESMM.Maintenance Condition Assessment
RPM must evaluate maintenance conditions.Relevant elements include:
Maintenance Responsibility
Maintenance Capability
Required Expertise
Available Tools
Corrective Update Availability
Security Remediation Capability
Maintenance Cost
Known Limitations
End-of-Maintenance Conditions
Maintenance infeasibility may strengthen retirement justificationwithout establishing immediate withdrawal feasibility.
Unsupported Software Planning
Where software is unsupported but remains operational, RPM mustestablish an appropriate transition pathway.
Relevant elements include:
Unsupported Software Identity
Operational Necessity
Known Security Exposure
Dependency Conditions
Operational Restrictions
Replacement Feasibility
Migration Requirements
Responsible Function
Retirement Review Conditions
Unsupported operation must remain an explicit governance condition.Replacement Requirement Assessment
RPM must determine whether replacement software is required.Relevant considerations include:
Continuing Functional Need
Replacement Availability
Functional Suitability
Interface Compatibility
Data Compatibility
Security Requirements
Operational Readiness
Migration Feasibility
Retirement does not always require replacement.Where replacement is necessary, its suitability must be established
through applicable governance.
Replacement Alternative Assessment
Where multiple replacement pathways exist, RPM must preserve the basisfor selecting among them.
Relevant elements include:
Candidate Replacement
Functional Coverage
CompatibilitySecurity Conditions
Operational Sustainability
Migration Complexity
Dependency Consequences
Required Resources
Known Uncertainty
The preferred replacement must not be selected solely because it isavailable or inexpensive.
Migration Requirement Identification
RPM must identify whether migration is necessary.Potential migration objects include:
Software Functions
Users
Data
Configurations
Interfaces
Operational Workflows
Automation Tasks
Service Integrations
Historical Records
Dependent Applications
Detailed migration execution remains governed by SMM and applicable
specialized lifecycle standards.Migration Feasibility
RPM must assess whether the intended migration can be achieved.Relevant elements include:
Destination Availability
Functional Compatibility
Data Compatibility
Required Interfaces
Operational Resources
Verification Capability
Recovery Feasibility
Migration Constraints
External Dependencies
An intended migration pathway must not be considered feasible withoutsufficient evidence.
Data Continuity Planning
RPM must identify data relationships affected by retirement.Relevant elements include:
Data Ownership
Data Location
Data Accessibility
Data Integrity
Data Migration
Data Retention
Data Deletion Requirements
Historical Records
Backup Dependencies
Recovery Requirements
Software retirement must not silently eliminate continuing dataobligations.
Data Retention Boundary
RPM must distinguish software withdrawal from data retention anddisposal.
Potential conditions include:
Software Retired — Data Retained
Software Retired — Data Migrated
Software Retired — Data Archived
Software Retired — Data Disposal Pending
Software Retired — Data Disposal Verified
Detailed data retention and deletion obligations remain subject to
applicable specialized governance and legal requirements.Interface Transition Planning
RPM must identify interfaces affected by retirement.Relevant elements include:
Interface Identity
Dependent Consumers
Communication Protocols
Data Exchange Requirements
Replacement Interfaces
Compatibility Conditions
Transition Timing
Withdrawal Requirements
Unidentified consumers may create material retirement uncertainty.Operational Continuity Planning
RPM must identify operational functions that must continue during orafter retirement.
Relevant elements include:
Critical Services
Required Availability
Replacement Readiness
Fallback Capability
Data Accessibility
External Integrations
Operational Dependencies
Recovery Conditions
Affected Users
Retirement planning must not create an unsupported assumption thatwithdrawal can occur without operational consequences.
Recovery and Contingency Planning
Where retirement failure could cause material harm, RPM must identifyappropriate contingency requirements.
Potential elements include:
Recovery Objective
Fallback Software
Rollback Feasibility
Data Recovery
Operational Restoration
Responsible Function
Required Resources
Recovery Verification
Escalation Conditions
Recovery planning must reflect whether the retirement action isreversible.
Retirement Reversibility
RPM must assess the reversibility of material retirement activities.Relevant categories include:
Fully Reversible
Conditionally Reversible
Partially Reversible
Operationally Irreversible
Unknown
Relevant considerations include:Data Deletion
Credential Revocation
Interface Withdrawal
Dependency Removal
Infrastructure Decommissioning
Migration State
External System Effects
Irreversible activities require appropriate governance conditions before
execution.Security Planning
RPM must identify security implications of retirement.Relevant elements include:
Unsupported Vulnerabilities
Residual Credentials
Service Accounts
API Keys
Certificates
Exposed Interfaces
Unmaintained Components
Archived Software
Data Exposure
Monitoring Requirements
Security requirements must be directed to the applicable specializedgovernance mechanisms.
Access and Authority Planning
RPM must identify access and authority relationships affected byretirement.
Relevant elements include:
Software Accounts
Service Credentials
Administrative Permissions
Agent Permissions
Automated Execution Rights
External System Access
Scheduled Actions
Delegated Authority
Successor Authority
Revocation Requirements
The retirement plan must distinguish software execution terminationfrom authority termination.
Autonomous Software Retirement Planning
Where autonomous software is being retired, RPM must assess:Agent Identity
Assigned Objectives
Active Tasks
Delegated Authority
Tool Permissions
Memory References
External Actions
Pending Commitments
Human Override
Successor System
Retirement planning must preserve the continuity of unresolved tasksand obligations.
Physical-System Considerations
Where software interacts with physical equipment, RPM must identifymaterial physical-system consequences.
Relevant elements include:
Device Identity
Installed Firmware
Operational Function
Physical Safety Conditions
Equipment Compatibility
Maintenance Availability
Replacement Feasibility
Recovery Requirements
Operational Restrictions
Software retirement must not assume that physical equipment cancontinue operating safely without the retiring software.
Retirement Feasibility Assessment
RPM must evaluate the overall feasibility of the intended retirementpathway.
Relevant dimensions include:
Technical Feasibility
Operational Feasibility
Dependency Feasibility
Migration Feasibility
Data Continuity Feasibility
Security Feasibility
Resource Feasibility
Authority Feasibility
Verification Feasibility
Recovery Feasibility
Feasibility conclusions must preserve their evidence and knownlimitations.
Retirement Alternatives
RPM may evaluate alternative retirement pathways.Potential alternatives include:
Immediate Retirement
Phased Retirement
Partial Retirement
Restricted Continued Operation
Replacement Before Withdrawal
Migration Before Withdrawal
Temporary Extended Support
Component Isolation
Controlled Decommissioning
The selected pathway must remain connected to the retirement purposeand actual operational conditions.
Retirement Sequencing
RPM must establish the sequence of material retirement activities.A possible sequence is:
Retirement Decision → Dependency Identification → Migration Preparation →
Replacement Verification → Operational Transition → SoftwareWithdrawal → Residual Dependency Assessment → Retirement Closure
The sequence must reflect the actual dependencies and constraints of
the software environment.
Retirement Preconditions
RPM must identify conditions that must be satisfied before materialretirement actions.
Potential preconditions include:
Applicable Retirement Decision
Dependency Assessment Completed
Required Migration Ready
Data Continuity Established
Affected Users Prepared
Operational Restrictions Defined
Required Resources Available
Withdrawal Authority Established
Recovery Conditions Prepared
Verification Capability Available
Unmet mandatory preconditions must remain explicit.Retirement Resource Readiness
RPM must assess the resources required to execute the retirement plan.Relevant elements include:
Responsible Personnel
Technical Expertise
Required Tools
Infrastructure Access
Migration Capacity
Verification Capability
Operational Support
Recovery Resources
External Dependencies
Resource availability must be established rather than assumed.Retirement Capability Readiness
RPM must evaluate whether the responsible actors possess thecapability to perform required retirement activities.
Relevant elements include:
Technical Competence
System Knowledge
Required Authorizations
Operational Access
Dependency Understanding
Migration Expertise
Verification Capability
Recovery Capability
Assignment of responsibility does not automatically establishoperational capability.
Retirement Authority Alignment
RPM must identify the authority required for material retirementdecisions and actions.
Relevant elements include:
Retirement Decision Authority
Software Ownership
Operational Responsibility
Migration Authority
Deployment or Withdrawal Authority
Data Governance Authority
Access Revocation Authority
External Approval Requirements
Delegation Conditions
Task Authority ≠ Constituent Action Authority.Approval to retire software does not automatically authorize every
dependent action.
Retirement Planning Responsibility
RPM must establish responsibility for maintaining and executing theretirement plan.
Relevant elements include:
Planning Owner
Operational Owner
Technical Responsible Function
Migration Responsible Function
Security Responsible Function
Data Responsible Function
Withdrawal Responsible Function
Verification Responsible Function
Escalation Responsibility
Responsibilities must remain connected to applicable authority andcapability.
Stakeholder Identification
RPM must identify stakeholders materially affected by retirement.Potential stakeholders include:
Software Owners
Operational Teams
Users
Customers
Integration Partners
Support Providers
Data Owners
Security Functions
Infrastructure Operators
External Authorities Where ApplicableStakeholder identification must reflect actual dependency and
responsibility relationships.
Retirement Communication Requirements
RPM must identify material communication obligations.Relevant elements include:
Communication Purpose
Affected Stakeholders
Retirement Scope
Support Changes
Migration Requirements
Operational Restrictions
Required Actions
Communication Timing
Responsible Function
Communication must not substitute for operational readiness orauthority.
Retirement Timeline and Conditions
RPM must establish relevant timing requirements.Potential elements include:
Support End Condition
Maintenance End Condition
Migration Readiness Target
Operational Transition Window
Withdrawal Window
Verification Period
Residual Obligation Review
Retirement Closure Target
A target date must not override mandatory governance preconditions.Retirement Readiness Assessment
RPM must determine whether the retirement plan has established theconditions necessary for subsequent governance activities.
Relevant elements include:
Retirement Purpose Defined
Software Identity Established
Scope and Boundaries Defined
Material Dependencies Identified
Migration Requirements Established
Data Continuity Addressed
Operational Continuity Addressed
Security Requirements Identified
Required Authority Established
Resources and Capabilities Available
Verification Requirements Defined
Material Uncertainty Addressed
Readiness must remain evidence-supported and scope-specific.Retirement Planning Classification
RPM recognizes the following planning states:Planning Initiated
Software Identification Pending
Retirement Purpose Defined
Scope Assessment Active
Impact Assessment Active
Dependency Assessment Active
Migration Assessment Active
Feasibility Assessment Active
Authority Alignment Pending
Plan Draft
Plan Under Review
Plan Accepted
Plan Approved
Planning Ready
Planning Conditionally Ready
Planning Blocked
Planning Deferred
Planning Rejected
Reassessment Required
Unknown
Conflicted
Each classification must preserve the supporting evidence andapplicable conditions.
Planning Uncertainty
RPM must preserve uncertainty that materially affects retirementfeasibility or readiness.
Potential uncertainty includes:
Unknown Dependencies
Unverified Software Instances
Incomplete Data Inventory
Uncertain Migration Feasibility
Unknown Operational Consumers
Unverified Recovery Capability
Unclear Authority
Insufficient Resources
Conflicting Retirement Evidence
Material uncertainty must not be concealed by an aggregate readinessscore.
Planning Deviation
A planning deviation occurs when the retirement pathway differsmaterially from the established assumptions or approved scope.
Potential deviations include:
Unexpected Dependency
Changed Software Scope
Unavailable Replacement
New Security Requirement
Migration Infeasibility
Resource Loss
Authority Change
New Operational Obligation
Material deviations must trigger appropriate reassessment.Planning Reassessment
RPM must support reassessment when relevant conditions change.Reassessment triggers may include:
New Software Instance Discovered
Dependency Relationship Changed
Replacement Software Changed
Migration Conditions Changed
Support Conditions Changed
Operational Requirements Changed
Security Exposure Changed
Retirement Authority Changed
Recovery Feasibility Changed
The revised plan must preserve its relationship to earlier planningevidence and decisions.
Retirement Plan Versioning
Every material retirement plan revision must remain identifiable.Relevant elements include:
Plan Version
Revision Origin
Changed Requirements
Changed Scope
Changed Dependencies
Changed Transition Sequence
Changed Authority Conditions
Changed Readiness Conclusions
Revision Evidence
Applicable Decision
Historical plan versions must not be silently overwritten.Planning Evidence
RPM must preserve evidence supporting material planning conclusions.Potential evidence includes:
Software Inventory
Artifact and Version Records
Deployment Records
Support Agreements
Maintenance Records
Security Assessments
Dependency Maps
Operational Monitoring
Data Inventories
Migration Feasibility Assessments
Replacement Assessments
Authority Records
Resource Assessments
Planning Decisions
Evidence must remain associated with the software state and conditionsto which it applies.
Governance Requirements
A conforming RPM implementation must satisfy the followingrequirements. Retirement Identity and Purpose
- Establish a stable retirement planning case identity
- Identify the software object subject to retirement
- Preserve the retirement origin
- Establish the retirement purpose
- Preserve retirement justification
- Identify the current lifecycle state
- Identify the current operational state
- Define the intended retirement state
Scope and Impact
- Establish retirement scope
- Establish retirement boundaries
- Identify affected software versions and environments
- Evaluate retirement significance
- Identify direct retirement consequences
- Identify indirect retirement consequences
- Identify material uncertainty
- Preserve relevant impact evidence
Dependencies and Continuity
- Identify upstream dependencies
- Identify downstream dependencies
- Identify unknown or unverified dependencies
- Establish support transition requirements
- Identify migration requirements
- Evaluate replacement suitability where applicable
- Establish data continuity requirements
- Identify interface transition requirements
- Establish operational continuity requirements
- Identify security and authority implications
Feasibility and Readiness
- Evaluate retirement feasibility
- Identify applicable alternatives
- Establish retirement sequencing
- Identify mandatory preconditions
- Establish resource requirements
- Evaluate capability readiness
- Identify required authority
- Establish verification requirements
- Evaluate recovery feasibility
- Establish retirement readiness criteria
Governance and Continuity
- Identify planning responsibility
- Identify affected stakeholders
- Establish material communication requirements
- Preserve planning evidence
- Establish planning status
- Preserve plan revisions
- Identify reassessment triggers
- Prevent planning approval from being treated as withdrawal
- Preserve handoff requirements to subsequent retirement
governance - Maintain continuity between the retirement plan and the original
authorization. retirement purpose.
Governance Logic
Retirement Signal → Retirement Case Identity → Software Object
Identification → Retirement Origin → Retirement Purpose → RetirementJustification → Current Lifecycle State → Current Operational State →
Intended Retirement State → Retirement Scope → Retirement Boundary →
Retirement Impact → Dependency Assessment → Support Conditions →
Migration Requirements → Data Continuity → Operational Continuity →
Security and Authority Requirements → Retirement Feasibility →
Retirement Alternatives → Transition Sequence → Resource and
Capability Readiness → Verification Requirements → Retirement
Readiness → Planning Decision → Software Retirement Plan Profile
Where the proposed retirement is feasible:
Retirement Proposal → Feasibility Established → Transition Requirements
Defined → Readiness Assessment → Plan Approval or AcceptanceWhere retirement depends on migration:
Retirement Proposal → Replacement Requirement → Migration Feasibility →
Data and Function Continuity → Transition Sequence → Migration HandoffWhere critical dependencies remain unknown:
Retirement Proposal → Dependency Uncertainty → Further Discovery → Revised
Impact Assessment → Updated Retirement PlanWhere retirement is not currently feasible:
Retirement Proposal → Feasibility Failure → Alternative Pathway / Deferral
/ Restricted Operation → ReassessmentWhere material conditions change:
Existing Plan → New Evidence → Planning Reassessment → Revised Plan →
Updated ReadinessRPM must not equate retirement intention, planning completion, and
withdrawal authorization.
Governance Outputs
The principal output is:Software Retirement Plan Profile
Supporting outputs may include:Retirement Planning Case Identity
Retirement Origin Record
Retirement Purpose Profile
Retirement Justification Record
Current Software State Profile
Intended Retirement State Profile
Retirement Scope Record
Retirement Boundary Record
Retirement Impact Assessment
Retirement Dependency Map
Support Condition Assessment
Migration Requirement Profile
Replacement Feasibility Assessment
Data Continuity Requirements
Operational Continuity Requirements
Security and Authority Requirement Record
Retirement Alternative Assessment
Retirement Transition Sequence
Retirement Preconditions Register
Resource and Capability Readiness Assessment
Retirement Readiness Profile
Retirement Planning Evidence Register
Retirement Plan Revision Record
Minimum Implementation Framework
A minimum RPM implementation must establish eight governance layers.Layer 1 — Retirement Identity and Purpose
Identify the retiring software, originating condition, retirement purpose,
and supporting justification. Layer 2 — Current and Intended StatesEstablish the software's actual lifecycle and operational conditions and
define the intended retirement state. Layer 3 — Scope and ImpactIdentify the retirement scope, boundaries, affected systems, direct
consequences, and indirect consequences. Layer 4 — Dependencies andContinuity
Identify upstream and downstream dependencies, data relationships,
operational continuity requirements, and material uncertainty. Layer 5— Transition Requirements
Establish support transition, migration, replacement, security, access, and
withdrawal requirements where applicable. Layer 6 — Feasibility andAuthority
Evaluate technical and operational feasibility, required resources, actor
capabilities, applicable authority, and recovery conditions. Layer 7 —Retirement Readiness
Establish mandatory preconditions, transition sequence, verification
requirements, and evidence-supported readiness conclusions. Layer 8 —Planning Continuity
Preserve the Software Retirement Plan Profile, planning evidence,
decisions, revisions, unresolved conditions, and handoff requirements.The framework may be implemented through manual governance processes,
software inventory systems, service management platforms, automated
analysis, or AI-assisted tools.
The methodology remains independent of the implementation technology.
Cross-Module Boundary
RPM → ESMM
RPM identifies support and maintenance conditions relevant toretirement.
ESMM governs the detailed end-of-support transition, unsupported operation,
continuing support obligations, and associated restrictions.RPM → SMM
RPM identifies migration requirements, feasibility, affected functions,
data relationships, and transition conditions.SMM governs the detailed software migration process and its
verification.
RPM → RDMM
RPM identifies known and potential dependencies relevant toretirement.
RDMM governs residual dependencies that must be resolved, transferred,
restricted, or explicitly retained during and after retirement.
RPM → RCCLM
RPM establishes the intended retirement state, scope, readiness conditions,
and verification requirements.RCCLM evaluates the actual retirement outcome and establishes the
legitimate closure disposition.RPM establishes the retirement pathway. It does not independently
establish that the pathway has been executed or completed.
Cross-Architecture Boundary
RPM establishes retirement planning requirements within SRTS.It may depend on other SLGA™ Parent Standards where retirement
activities affect their governed domains.
SRS — Software Requirements Standard
Requirements governing replacement, migration, and continuing software
capabilities.SCS — Software Creation Standard
Creation of migration tools, replacement components, or supportingsoftware.
SDS — Software Dependency Standard
Dependency identification, suitability, continuity, and change.SCFS — Software Configuration Standard
Artifact identity, configuration baselines, and changes required for
retirement.SQS — Software Quality Standard
Quality requirements and verification of replacement or modifiedsoftware.
SSS — Software Security Standard
Security requirements, exposure, vulnerabilities, and remediation.SRLS — Software Release Standard
Release governance for replacement or migration software.SDPS — Software Deployment Standard
Deployment and operational transition governance.SCMS — Software Change Management Standard
Governance of software changes required by retirement.SLCS — Software Lifecycle Control Standard
Lifecycle state consistency, transition control, exceptions, andcontinuity.
RPM may also reference applicable OOF® authority, accountability,
operational reality, autonomous systems, and data governance
mechanisms.
RPM does not replace their specialized governance functions.
Practical Applications
Enterprise Application Retirement
Planning the controlled withdrawal of obsolete applications while
preserving required operational functions and data access.Cloud Service Consolidation
Establishing retirement pathways for redundant services and their dependent
applications.Software Supply-Chain Modernization
Planning the removal of unsupported libraries and components from active
software products.AI System Retirement
Identifying model dependencies, active services, stored outputs, access
permissions, and successor requirements.Autonomous Agent Decommissioning
Planning the termination or transfer of agent execution, delegated
authority, active tasks, and continuing obligations.Industrial and Embedded Software
Planning firmware withdrawal or replacement while preserving
physical-system compatibility and operational safety.Critical Infrastructure
Establishing evidence-supported retirement feasibility, continuity
requirements, and transition readiness for software supportingessential services.
Practical Use Case 1 — Retirement of an Unsupported Enterprise
ApplicationAn organization plans to retire an enterprise application because its
vendor has ended technical support.The application appears obsolete, and a replacement system is
available.
An initial retirement proposal recommends deactivating the original
application within one month.RPM establishes the retirement planning case and evaluates:
Software Identity → Operational Role → Retirement Purpose → Dependency
Relationships → Data Continuity → Replacement Feasibility → TransitionRequirements → Readiness
The assessment identifies:
- The application remains connected to a financial reporting
process - Historical records are accessible only through a legacy
interface - The replacement system supports current operations but does not
yet - Immediate withdrawal would create a material data accessibility
- Migration and compatibility verification are required before
reproduce all required historical reporting functions. problem.
retirement readiness can be established.
The retirement plan is revised to include historical data continuity,
replacement verification, dependency resolution, and controlled
withdrawal sequencing.
The appropriate planning classification is:
Retirement Planning Active — Migration and Data Continuity Preconditions
Outstanding.Replacement Available ≠ Retirement Ready.
Practical Use Case 2 — Retirement Planning for an Autonomous
Maintenance AgentAn organization decides to replace an autonomous software maintenance agent
with a newer system.The retiring agent performs repository maintenance, executes scheduled
checks, accesses deployment tools, and maintains persistent taskrecords.
The organization initially assumes that stopping the agent's main
execution process will complete its retirement.
RPM evaluates:
Agent Identity → Operational Functions → Active Tasks → Delegated
Authority → Tool Access → Data and Memory References → SuccessorRequirements → Withdrawal Conditions
The assessment identifies:
- The agent has active repository permissions
- Scheduled tasks may continue through external automation
- Some maintenance responsibilities must be transferred to the
successor - Persistent records are needed to preserve operational continuity
- Access revocation requires coordination with shared
infrastructure - Retirement verification must cover more than the primary
execution
system. services. process.
RPM establishes a retirement pathway that includes task transfer,
authority termination, credential review, scheduled execution control,
and verification requirements.
The appropriate planning classification is:
Retirement Plan Conditionally Ready — Authority and Task Continuity
Preconditions Required.Agent Execution Stopped ≠ Agent Retirement Completed.
Critical Distinctions
Retirement Proposal ≠ Retirement Decision.Retirement Justification ≠ Retirement Feasibility.
Retirement Intention ≠ Retirement Readiness.
Retirement Plan Approved ≠ Withdrawal Authorized.
Planning Completed ≠ Retirement Executed.
Software Identified ≠ Every Operational Instance Identified.
Current Administrative State ≠ Actual Operational State.
Replacement Available ≠ Replacement Suitable.
Migration Planned ≠ Migration Feasible.
Support Termination ≠ Operational Withdrawal.
Unsupported Software ≠ Inactive Software.
Direct Impact Identified ≠ Indirect Impact Understood.
Dependency Listed ≠ Dependency Verified.
Data Migration Planned ≠ Data Continuity Established.
Task Authority ≠ Constituent Action Authority.
Agent Execution Termination ≠ Agent Authority Termination.
Readiness Assessment ≠ Withdrawal Verification.
Retirement Plan ≠ Retirement Closure.
Canonical Boundary
Retirement Planning Module (RPM) governs the evidence-supported
preparation of software retirement through identification,justification, scope definition, impact assessment, feasibility
evaluation, transition planning, authority alignment, and readiness
determination.
It establishes the relationship between the retiring software's current
condition and its intended retirement state.It identifies the dependencies, operational functions, data relationships,
migration requirements, support conditions, security implications, andresidual obligations that must be addressed through subsequent
retirement governance.
RPM does not execute software withdrawal, terminate support
obligations, perform migration, resolve residual dependencies, or
declare retirement complete.
Its principal governance output is the:
Software Retirement Plan Profile
This output provides the structured governance basis for controlled
software retirement while preserving the distinction between a plannedtransition and a verified retirement outcome.
Canonical Closing Statement
Software retirement cannot be governed reliably when the organizationknows only what it wants to discontinue but does not know what still
depends on it.
An application may appear obsolete while remaining essential to
historical data access.
A library may no longer receive updates while continuing to support
active production systems.
A cloud service may be scheduled for shutdown while external consumers
still depend on its interfaces.
An autonomous agent may be marked for retirement while retaining
delegated permissions and unfinished tasks.
And embedded software may appear replaceable while physical equipment
remains dependent on its exact operational behavior.
RPM establishes the planning discipline required to recognize these
conditions before retirement actions begin.It requires the retiring software to be identified within its actual
operational environment.
It connects the retirement purpose to evidence, feasibility, and the
intended resulting state.It establishes the dependencies, migration requirements, support
transitions, authority conditions, and verification obligations thatmust shape the retirement pathway.
It preserves uncertainty rather than concealing it within an
optimistic project schedule.
And it prevents the approval of a retirement plan from being mistaken for
proof that the software can already be withdrawn safely.The purpose of retirement planning is not merely to determine when
software should stop operating. It is to establish what must be true
before its operational role can legitimately end.
Retirement Planning Module (RPM) transforms software retirement planning
from a discontinuation schedule into an evidence-supported governancefoundation for controlled transition, operational continuity, and
verifiable retirement readiness.